Groundwater Spill

Groundwater Spill Response Load Options

Our groundwater spill response capability is limited to the provision of equipment that can be installed at a facility where pre-existing boreholes and groundwater wells are present.

Groundwater Spill – Load 1 – Oil Skimming Pump

  • 100mm Xitech Pneumatic Oil Skimmer Unit
  • Pneumatic Pipes / Product Recovery Pipes
  • 110v Compressor Unit
  • Tripod and Winch

Groundwater Spill – Load 2 – Stinger Equipment

  • Stinger Lances, Tips and Bungs for Product Recovery
  • Associated Header Connections, Pipework and Manifolds
  • Vacuum Knock Out Pots for Product Recovery
Spill Response Wales